ERTEK System –
Assembly - Sewage
Skeletons of foundation units are assembled with columns and pre-slabs by bolting. The positioning of
these elements is supported by a small crane. Channels formed between adjacent columns, in common with the openings of the joints
and the empty space of the pre-slabs, make possible the routing of pipes
to any point of the construction. This possibility appears at the specific
point of the construction's development as an emergent
property. An
important consequence is the easiness to install an underfloor heating/cooling system, which contributes to the
functionality of the construction as an integrated
system having reduced usage cost.